Service · Showers, tubs, and floors
Bathrooms
Walk-in showers, tub replacements, tile, and full bath remodels.

Bathrooms have the least room for mistakes. We build wet areas to hold up: proper slope, waterproofing, and tile set to a plan.
We can take a bathroom down to the studs or update the shower and floor and leave the rest. Either way, the proposal is itemized.
What is included
- Walk-in shower conversions
- Tub and surround replacement
- Floors, walls, and trim
- Waterproofing and ventilation checks


Common questions
Can you convert a tub to a shower?
Yes. It involves plumbing, waterproofing, and tile, all itemized in the proposal.
How long is a bath remodel?
A shower and floor update is often about a week. A full remodel takes longer. Your proposal gives the timeline.
Sample project
See a before and after

BeforeAfter- Scope
- Full gut, marble-look tile shower, glass door
- Location
- [add town]
- Timeline
- 2 weeks
Ready for an estimate?
Call, text, or send photos. Larry gets back to you the same day.